Permit Application
In line with our objective to have an efficient and effective permit procedures, please be advised on therevised application guidelines for ABPEA Online Permit Applications (ABPEA CM No. 2024-06-001) and Night Shift Teller Transactions (ABPEA CM No. 2024-09-003).
ESTATE GATE PASS PERMIT
STEP 1: Application
✓ Submit the accomplished ABPEA Gate Pass Form via email to permits@abpea.com, or apply online through our website at abpea.com under the Permit Application tab. The gate pass form is also available for download on the website. Below are the requirements for each type of gate pass application:
GENERAL REQUIREMENTS | DELIVERY | PULL OUT | HAULING ACTIVITY | ||
---|---|---|---|---|---|
CONSTRUCTION DEBRIS | SOIL | HAZARDOUS WASTE / SIPHONING | |||
Accomplished Gatepass Form | ✓ | ✓ | ✓ | ✓ | ✓ |
Letter of Intent | ✓ | ||||
Approval from Locator/Contractor | ✓ | ✓ | ✓ | ✓ | ✓ |
DENR Permit/Clearance | ✓ |
✓ If the application is submitted via email, please use the following file name format:
Plate # – Project Name – Contractor Name
Sample: ABC123-PARQAL-ABC CORP.pdf
✓ Once the submitted application has been reviewed and all the requirements have been completed, a reference number shall be issued before proceeding with the payment.
Step 2: Payment
✓ Payment details will be provided along with the issuance of your reference number. If you choose to pay at the ABPEA Accounting Office, please make sure to present your reference number upon payment. Strictly no reference number, no payment policy.
✓ Settle the Gate Pass Fee per entry/vehicle:
PERMIT DESCRIPTION | NEW RATES | REMARKS | ||||||
---|---|---|---|---|---|---|---|---|
GATEPASS | ||||||||
4W | 300 (Applicable for constructing locators only) | All rates are applicable per entry per vehicle (VAT Inclusive) | ||||||
6W | 300 | |||||||
8W | 300 | |||||||
10W | 500 | |||||||
12-14W | 800 | |||||||
16-18W | 1000 | |||||||
20W-UP | 1000 |
✓ Once the applicable fees have been settled, please send a copy of the ABPEA payment receipt to permits@abpea.com.
Step 3: Approval & Releasing
✓ Once the payment has been settled and verified, the approved gate pass permit shall be released within the next working day.
✓ Once approved, kindly print two (2) copies of the gate pass permit. One (1) copy shall be submitted to the estate security prior entry/exit. The hard copy of the approved gate pass permit shall be presented and shall always be made available upon security inspection. Non-compliance will be subject to work/activity stoppage.
✓ Releasing and processing is from Mondays - Fridays, 8:00AM - 4:00pm All applications submitted beyond office hours shall be assessed the next working day.
Important Reminders:
- Applications with lacking documents/details shall not be processed.
- All operational locators shall be required to secure gate pass permit for vehicles with six (6) wheels and above. On the other hand, all under-construction locators shall be required to secure gate pass permit for vehicles with four (4) wheels and above.
- All hauling activities will now be integrated into the gate pass system, with requirements subject to assessment by the relevant department. This change eliminates the need for a separate hauling permit, streamlining the permitting process and improving monitoring and compliance.
- For locators currently under construction, additional specific requirements may be necessary beyond the standard list. These requirements will be determined and communicated by our Development Control team as needed.
ESTATE WORK PERMIT
STEP 1: Application
✓ Submit the accomplished ABPEA Estate Work Permit Form via email to permits@abpea.com, or apply online through our website at abpea.com under the Permit Application tab. The estate work permit form is also available for download on the website. Below are the requirements for each type of estate work permit application:
ACTIVITY / FEES (VAT inclusive) | MINIMUM REQUIREMENTS |
---|---|
UNDER CONSTRUCTION LOCATORS | |
1. All Construction/Fit-out/Installation Activities ₱ 1,904.00 – 7 days ₱ 2,688.00 – 14 days ₱ 5,600.00 – 30 days |
*Additional submittals may be required depending on the nature of work being applied. |
OPERATIONAL LOCATORS | |
1. Exterior Works (Repainting, Façade Repair/Cleaning, etc.) Estate Fee: ₱ 1,120 (1-15 days) ₱ 2,240 (16-30days) |
*For major construction/renovation works, additional fees & submittals may be required. |
2. Building/Retail/Board-up Signage Installation Subject for further assessment. |
*ABPEA Estate Work Permit must be secured prior installation / fabrication of the proposed signage |
3. Fit-Out Works (Arcade Tenants) Subject for further assessment. |
|
OTHER ACTIVITIES | |
1. Road Usage – One lane/24 hrs ₱ 5,600 – Day Rate |
*For total road closure requests, ABPEA Permit must be secured 2 weeks prior mobilization. |
2. Events (Concert, Fun Run, etc.) |
|
3. Drone Usage ₱ 1,120.00 / day |
|
✓ If the application is submitted via email, please use the following file name format:
Activity/Project Name – Locator Name – Contractor Name
Sample: ROAD USAGE-PARQAL-ABC CORP.pdf
✓ Once the submitted application has been reviewed and all the requirements have been completed, a reference number shall be issued before proceeding with the payment.
Step 2: Payment (If applicable)
✓ Payment details will be provided along with the issuance of your reference number. If you choose to pay at the ABPEA Accounting Office, please make sure to present your reference number upon payment. Strictly no reference number, no payment policy.
✓ Once the applicable fees have been settled, please send a copy of the ABPEA payment receipt to permits@abpea.com.
Step 3: Approval & Releasing
✓ Once the payment has been settled and verified, the approved estate work permit shall be released within the next working day.
✓ Once approved, kindly print two (2) copies of the Estate Work Permit. One (1) copy shall be submitted to the estate security prior mobilization. The hard copy of the Estate Work Permit shall be presented and shall always be made available upon security inspection. Non-compliance will be subject to work/activity stoppage.
✓ Releasing and processing is from Mondays - Fridays, 8:00AM - 4:00pm All applications submitted beyond office hours shall be assessed the next working day.
Important Reminders:
- Applications with lacking documents/details shall not be processed.
- All operational locators shall be required to secure gate pass permit for vehicles with six (6) wheels and above. On the other hand, all under-construction locators shall be required to secure gate pass permit for vehicles with four (4) wheels and above.
- All hauling activities will now be integrated into the gate pass system, with requirements subject to assessment by the relevant department. This change eliminates the need for a separate hauling permit, streamlining the permitting process and improving monitoring and compliance.
- For locators currently under construction, additional specific requirements may be necessary beyond the standard list. These requirements will be determined and communicated by our Development Control team as needed.